Choosing Blog Hosting For Private Or Corporate Blogs
Friday, 07 July 2023
Clause step 4.3.1 c) requires that ISMS documentation must integrate. “procedures and controls in support of the ISMS” – does which means that that a document end up being written for each of the controls that are applied (there are 133 controls in Annex A)? In my view, that is not necessary – I usually
- Published in Aeroespacial
No Comments